Version Number Developer Date Time Notes
2000..161 KJT 06/29/2007 10:38:06 Added KeyLok support.
2000..160 MRM 05/25/2007 14:52:58 Fixed Select from Othe Library to bring in blank Mtl Code items to existing estimate
2000..159 MRM 05/04/2007 16:23:21 Fixed Zoom on UR field in Modify Estimate to not use FT field
2000..158 MRM 04/24/2007 16:48:50 Added a program to force the creation of the IKEFP Logical Name so VTO will find color file. Fixed Est Other Cost Screen Scroll Problem
2000..157 MRM 04/23/2007 14:47:10 Added 'S'pray Top Flange to Fill Flute Options of 'Y'es and 'N'o. Added Detail Sort Buttons for Size and Rec#
2000..156 MRM 04/23/2007 11:03:59 Corrected Problem in updating VTO colors during recalc.
2000..155 MRM 04/18/2007 12:14:30 Added Material Code delimiter to Recap Other Costs
2000..154 MRM 04/02/2007 15:38:36 Added Zoom function to ULDesign Code Screen when in Create Mode. Added Export/Import of Material Yields
2000..153 MRM 03/30/2007 15:49:06 Added Export of ULDesign Name and Bags/Gallons Switch if doing all UL Design codes for a Mtl Code
2000..152 MRM 03/29/2007 16:33:21 Increased the size of the ULDesign Tab Screen
2000..151 MRM 03/23/2007 12:58:58 Added Ability to import Many ULDesigns for a MTL Code
2000..150 MRM 03/19/2007 15:52:48 Added Qty Indicator 'TA' Total Area = (JA+CA+BA+DE)
Added Qty Indicator 'SA' Total Seal Area = (JA+CA+BA+DE) if Floor 'Include in Seal Area' Check Box is checked in Floor Takeoff Screen.
2000..148 MRM 03/01/2006 17:44:19 Changed Call VTO to be like other IKE modules
2000..147 MRM 02/06/2006 13:47:54 Added ' 1' - 'One' to QIN Table, it allows for the use of fixed cost or MD Recap Other Items
2000..146 MRM 01/24/2006 11:43:36 Added CD - Crew Days back into QIN Table, it got deleted in release 144.
2000..145 MRM 11/16/2005 15:34:13 Changed Estimate Selection program to correct program in the Thickness Report Prompt Program.
2000..144 MRM 11/15/2005 15:19:19 Added new Quantity Indicators and added Boxed Steel capabilities.
2000..143 MRM 11/04/2005 12:20:47 Corrected VTO menu card logical name.
2000..142 MRM 11/03/2005 11:12:05 Added ability to auto change VTO menu card to Fireproofing.menu via a logical name.
2000..141 MRM 07/08/2005 13:37:48 Added a Delete Detail Record by Record Number Utility.
2000..140 MRM 04/08/2005 13:06:40 Added Cost per Bag-Gal statistics to bid recap report. Corrected Margin% calc on bid recap.
2000..139 MRM 01/13/2005 15:06:43 Changed so zero WD does not look up Thickness. Changed Modifier Screens to Show WD and Size Thickness Lookups. Added Copy UL Design Program
2000..138 MRM 11/12/2004 16:08:02 Added a Batch Create Column WD Thickness Program for Intumescent Products. Changed some Reports for Bags/Gals BF/MILS
2000..137 MRM 10/19/2004 15:35:37 Changed Bid Recap Report so it has a lanscape printing option. Not printing right columns in portrait on all types of printers.
2000..136 MRM 09/13/2004 14:51:15 Changed Bid Recap Report and made it wider to print larger numbers
2000..135 MRM 03/19/2004 16:28:17 Changed Prod Screen so you can input in zero amonts for Machines, Nozzels, Setups.
2000..133 MRM 10/28/2003 17:32:39 Corrected Steel Shape program to allow for input of new Shapes.
2000..132 MRM 10/28/2003 16:06:49 Added WD Ratio Export and Import Programs
2000..131 MRM 10/27/2003 14:15:17 Added MILS and Gallons verbage to Report Headers
2000..130 MRM 10/24/2003 16:40:04 Added MILS verbage to Online Calculation Screens. Corrected MILS per LF by multiplying by 1000
2000..129 MRM 10/23/2003 18:21:58 Changed the calculate BF to Actual Thickness Decimal from Thickness Table instead of Lookup Decimal to get more pricision for MILS
2000..128 MRM 10/22/2003 16:36:19 Increased Field Size of, Yields to allow for 4 Digits, Thickness to allow for 3 Digits.
2000..127 MRM 10/22/2003 14:33:00 Fixed (Added Thick Add # ) so it would work correctly when using a Detail Line Thickness Override.
2000..126 MRM 10/02/2003 16:31:18 Added Thick Add # to Steel Size Table. Fixed Floor Prod Field to update correctly. Fixed Deck Overide Thk lookup.
2000..125 KJT 04/07/2003 16:11:03 Added Color Defaults by Thickness. Added Color to thickness report and Override screen. VTO version 2003.2.0 or higher is needed to use this feature.
2000..124 MRM 03/28/2003 11:25:05 Added Bags/CD to Summary Reports
2000..123 MRM 03/28/2003 10:45:24 Added Bags/ND to Summary Reports - Changed Detail Take-off to only Auto Skip Mtl Code in Create Mode
2000..122 MRM 03/05/2003 15:33:03 Changed Other Cost Library to create records correctly.
2000..120 MRM 02/24/2003 17:59:56 Added Delete Access Key Program to Help Menu
2000..119 MRM 02/04/2003 17:39:37 Added Bags/MD to Summary Reports - Corrected Floor Prod problem in Floor Setup - Corrected Zoom problem to FR code in UL design.
2000..118 MRM 01/03/2003 12:15:41 Changed the Change Material Code Utility in Take-off Screen to have an All floor option.
Added Other Cost Markup to Bid Price in Recap.
2000..117 MRM 11/15/2002 11:09:09 Added Select Crew Code and Rate to Est Master. Fixed Other Color. Fixed Col Flute Ex Flag Reset Prob. Added UR Range to Est. Fixed delete floor to delete Floor Other Record.
2000..116 MRM 11/06/2002 11:08:27 Added New Global VTO fields for Floor Take-off.
2000..115 MRM 11/04/2002 11:05:58 Added a Batch Estimate Utility to change Take-off Quantities by creating a mutilplier from two different scales.